The Metrolink parking lot will be undergoing a slurry seal rehab beginning August 5, 2019. Work is scheduled to be completed at the end of August 2019. The City of Rancho Cucamonga uses a method called slurry seal to restore existing asphalt pavement comprised of minor cracks throughout the parking lot. Slurry seal provides a new surface over existing asphalt, reducing the need for costly repairs, and extends the life of the pavement by an additional 5-8 years. The scope of work to be performed consists of weed abatement, routing and crack sealing, application of slurry seal, and restriping. We apologize for any inconvenience during this rehabilitation project. If you have any questions, please call the City’s Engineering Department at (909) 774-4010.

Construction Schedule:

August 5th-weedspray - No Closure

August 19th - Crack Seal Area 1 & Part of Area 2 Yellow shade, (Green shade will be open)

August 20th- Crack seal Area 2 Green shade (Yellow Shade will be open)

August 24th - Slurry Seal Area 1 Yellow shade (Green shade will be open)

August 25th- Slurry seal Area 2 Green shade (Yellow shade will be open)

August 26th - Re-stripe Area 1 Yellow shade (Green shade will be open)

August 27th - Re-Stripe Area 2 Green shade (Yellow shade will be open)