Wilson Avenue Extension Project
Location:    Wilson Avenue from East Avenue to Wardman Bullock Road

Project Description:   Construction of a two-lane roadway (one lane each direction) with a 6-foot wide asphalt walkway with concrete curb and gutter provided along the south side of the proposed street. Bike lanes will also be included in both directions.

Tentative Construction Schedule:  

        Authorization to Advertise the project – Spring 2012

        Commencement of Construction – Summer 2012

        Estimated Completion Date – Fall 2012

Approximate Cost:    $3.2 million