Wilson Avenue Extension Project Location: Wilson Avenue from East Avenue to Wardman Bullock Road
Project Description: Construction of a two-lane roadway (one lane each direction) with a 6-foot wide asphalt walkway with concrete curb and gutter provided along the south side of the proposed street. Bike lanes will also be included in both directions.
Tentative Construction Schedule:
Authorization to Advertise the project – Spring 2012
Commencement of Construction – Summer 2012
Estimated Completion Date – Fall 2012
Approximate Cost: $3.2 million
|
|  |
|